stats.radicle.at

mani

28 repositories listed here name this identity as a delegate.

Repositories
28
naming it as a delegate
Typical seed count
9
across all 28 of them
Size on radicle.at
73.0 MiB
all 28 measured here
Reach rank
#62
of 727 ranked delegates
Patches accepted
0
none yet
?
Repositories
Repositories listed on this site that name this identity as a delegate.
Typical seed count
The median seed count of this identity's repositories: how many nodes announce they will serve each one, never a verified copy on disk.
Size on radicle.at
The last recorded sizes of this identity's repositories on radicle.at's disk, added together.
Reach rank
Among identities with 3 or more repositories that have a known seed count, ranked by how widely those repositories are typically seeded.
Patches accepted
Merged patches on this identity's repositories, written by someone who is not a delegate of any of them. Counted from radicle.at's copy of those patches. Not all of them have been counted yet, so the real number can only be higher.

Activity

Active on 18 days in the last 12 months. The busiest was 26 Aug 2026, with 18 issues opened and 4 patches opened. Each square is a day.

Artifact-basis re-derivation: derive the ideal artifact forms blind, diff against the actual Issue opened 12 Jul 2026, closed 12 Jul 2026, 1 hour later. 5 replies.evidence(schema): every performed result stamps the configuration it observed; land gates on currency Issue opened 12 Jul 2026, still open. 1 reply.contract(schema): contracts version by supersession; evidence pins the contract version; amendment is a lawful path Issue opened 12 Jul 2026, still open. 2 replies.manifest: direction-request and operator-answer kinds — an executor-undecidable WHAT parks durably Issue opened 12 Jul 2026, still open.manifest: a retirement terminal closes mooted scoped work Issue opened 12 Jul 2026, still open.planning(threading): requirements references intent; work-unit references requirements; acquire gains its capture record Issue opened 12 Jul 2026, still open. 31 replies.test-evidence v-next: per-cycle evidence adopts the performed-result shape and is named for the fact Issue opened 12 Jul 2026, still open.completion-record: merge_reference requires the commit SHA; host links ride a handle-typed field Issue opened 12 Jul 2026, still open.documentation truth is a standing documentation-lens criterion discharged through results[] Issue opened 12 Jul 2026, still open.research-record: findings carry an observed-at stamp Issue opened 12 Jul 2026, still open.protocols: shed scripting and restated structure toward the Right-Action form Issue opened 12 Jul 2026, still open.The planning graph has exactly one home — two candidate invariants, one ratification Issue opened 12 Jul 2026, closed 20 Jul 2026, 8 days later. 2 replies.corpus resolver materializes immutable commit references Issue opened 12 Jul 2026, closed 12 Jul 2026, under an hour later. 3 replies.runtime installer preserves complete protocol instruction trees Issue opened 12 Jul 2026, closed 12 Jul 2026, under an hour later. 1 reply.Retired — acquisition E2E carries runa create-operation provenance Issue opened 12 Jul 2026, closed 14 Jul 2026, 2 days later. 1 reply.A mutation lands on a branch its purpose names, never on incidental checkout state Issue opened 12 Jul 2026, still open. 2 replies.Roadmap — groundwork Issue opened 12 Jul 2026, still open. 9 replies.freshen is a first-class groundwork skill with the graph re-check among its moves Issue opened 12 Jul 2026, still open. 1 reply.The artifact basis lands — ADR-0011 follow-on graph Issue opened 12 Jul 2026, still open.A repository hosting scoped work-units is its own pipeline home Issue opened 12 Jul 2026, closed 19 Jul 2026, 7 days later. 2 replies.Documentation remains true as authoritative dynamic facts evolve Issue opened 12 Jul 2026, still open.The interactive Groundwork lifecycle operates directly through Radicle and repositories Issue opened 13 Jul 2026, still open. 5 replies.Interactive Groundwork uses native Radicle and repository operations throughout its methodology Issue opened 13 Jul 2026, closed 21 Jul 2026, 8 days later. 62 replies.Contract criteria are independently acceptable promises, with examples and assertions beneath them Issue opened 13 Jul 2026, closed 19 Jul 2026, 6 days later. 31 replies.Purpose remains the governing spine across methodology, cognition, and the seat Issue opened 13 Jul 2026, still open. 17 replies.A complete Groundwork installation carries every instruction its skills reference Issue opened 14 Jul 2026, closed 14 Jul 2026, 1 hour later. 18 replies.Autonomous Groundwork drives the repository-native lifecycle through runa Issue opened 14 Jul 2026, still open.Purpose judgment reaches every supported agent at action time Issue opened 16 Jul 2026, closed 17 Jul 2026, 21 hours later. 10 replies.Purpose and the durable front reconstruct from authoritative lifecycle state Issue opened 16 Jul 2026, still open. 1 reply.Every Groundwork judgment satisfies purpose beside contract Issue opened 16 Jul 2026, still open. 1 reply.The ecosystem proves purpose continuity across every context boundary Issue opened 16 Jul 2026, still open. 1 reply.Review refusals carry grounds, revisions answer them, and a stuck loop exits upward Issue opened 17 Jul 2026, closed 19 Jul 2026, 2 days later. 3 replies.Purpose judgment reaches every supported agent at action time Patch opened 17 Jul 2026, merged 17 Jul 2026, 2 hours later. 3 revisions.8999f8b - independently acceptable contract promises Patch opened 18 Jul 2026, merged 19 Jul 2026, 29 hours later. 2 revisions.
34
principles: Re-ground evolvability in structure Patch opened 7 Aug 2026, merged 7 Aug 2026, 2 hours later.principles: Add the contrastive-naming principle Patch opened 10 Aug 2026, merged 10 Aug 2026, under an hour later.principles: Add the semantic-order principle Patch opened 10 Aug 2026, merged 10 Aug 2026, under an hour later.tooling: Add Spec Kit workflows Patch opened 10 Aug 2026, merged 10 Aug 2026, under an hour later.governance: Ratify the ecosystem constitution Patch opened 10 Aug 2026, merged 10 Aug 2026, under an hour later.conventions: Withdraw the Flutter standing answer and bound the Rust one Patch opened 11 Aug 2026, merged 11 Aug 2026, under an hour later.governance: Require the patch workflow and restate the test mandate as an outcome Patch opened 11 Aug 2026, merged 11 Aug 2026, under an hour later.governance: Repair the constitution audit findings across law and conventions Patch opened 11 Aug 2026, merged 11 Aug 2026, under an hour later.governance: Establish Radicle-native constitution v3.0.0 Patch opened 11 Aug 2026, merged 11 Aug 2026, 1 hour later. 3 revisions.governance: Remove the commons charter Patch opened 13 Aug 2026, merged 13 Aug 2026, under an hour later.skills: Add repository description reference style Patch opened 13 Aug 2026, still open.skills: add patch convergence supervision Patch opened 14 Aug 2026, still open.skills: rebuild the patch lifecycle on one shared library Patch opened 14 Aug 2026, still open.governance: dose re-review scope to the delta after prior acceptance Patch opened 15 Aug 2026, still open.skills: type every stop the loop may take Patch opened 15 Aug 2026, still open.skills: gate a convergence run on a reachable deliverable Patch opened 15 Aug 2026, still open.The constitution's specification obligations state what practice can actually meet Issue opened 25 Aug 2026, still open. 3 replies.The law projection's integrity check establishes that the law is held in the consuming repository's own tree Issue opened 25 Aug 2026, closed 25 Aug 2026, 5 hours later. 1 reply.The law projection's integrity check refuses an argument it does not honor Issue opened 25 Aug 2026, closed 25 Aug 2026, 4 hours later. 1 reply.lawkit: refuse displaced projection state Patch opened 25 Aug 2026, still open.A consuming repository learns its law projection is stale before reasoning under it Issue opened 25 Aug 2026, closed 28 Aug 2026, 3 days later. 2 replies.The law projection verifier refuses symlinked ancestors of projected paths Issue opened 25 Aug 2026, closed 28 Aug 2026, 3 days later. 1 reply.An answering-revision transaction creates exactly one revision at its head Issue opened 25 Aug 2026, still open. 2 replies.The law projection check derives its repository and its manifest from state the manifest covers Issue opened 25 Aug 2026, closed 28 Aug 2026, 3 days later. 1 reply.A governance artifact's first canonical appearance carries a first-ratification version Issue opened 25 Aug 2026, closed 28 Aug 2026, 3 days later. 1 reply.The groundwork skill bodies that belong here are homed here, and navigate has a disposition Issue opened 26 Aug 2026, still open.skills: home knowledge-alchemy and vendor asd-ste100 Patch opened 26 Aug 2026, still open.skills: home reckon, the cognitive discipline Patch opened 26 Aug 2026, still open. 2 revisions.The corpus-resolution check's stated coverage matches what its comparison decides Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.The skill-body link walk reads every relative-link form its name asserts Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.Feature 008's plan and tasks express the specification they sit beneath Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.A specification body carries no claim about a mutable external record's current state Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.The projection mechanism holds every class of vendored instruction, with the law as one instance Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.Feature 008's assumption describes FR-010's scope as widely as FR-010 states it Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.projection: hold every class of instruction, with the law as one instance Patch opened 26 Aug 2026, still open.The projection proof's containment check refuses every absolute path its schemas admit Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.Both proof forms run in the environment their contract names Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.A composer establishes the delegate's model and effort, and proves the run used them Issue opened 26 Aug 2026, closed 26 Aug 2026, 2 hours later. 1 reply.skills: decide the invocation instead of inheriting it Patch opened 26 Aug 2026, still open.The no-resolution guard covers every form the call it forbids can take Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.The proof's containment claim and its containment check name the same boundary Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.The closure obligation states a property the projection can establish Issue opened 26 Aug 2026, closed 26 Aug 2026, 2 hours later. 1 reply.A derivation either completes or leaves the destination as it found it Issue opened 26 Aug 2026, closed 26 Aug 2026, 2 hours later. 2 replies.A projection introduces no tracked execution surface outside its domain Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 1 reply.The projected proof and the producer schema state one record contract Issue opened 26 Aug 2026, closed 26 Aug 2026, 2 hours later. 2 replies.A recorded rejection carries the reversal ground that earns it Issue opened 26 Aug 2026, closed 31 Aug 2026, 4 days later. 3 replies.Orchestration is a seat with a skill, and its first act is to establish the standard Issue opened 26 Aug 2026, closed 28 Aug 2026, 2 days later. 4 replies.
47
Make the published extension installable with current Spec Kit Issue opened 13 Aug 2026, closed 13 Aug 2026, 3 hours later. 3 replies.Establish the Radicle-native maintained continuation Patch opened 13 Aug 2026, merged 13 Aug 2026, 2 hours later. 3 revisions.Make Radicle release tags reproducible from fresh clones Patch opened 13 Aug 2026, still open. 3 revisions.Make installed config loaders resolve the host project root Issue opened 13 Aug 2026, closed 13 Aug 2026, 4 hours later. 2 replies.Make roadmap-write distinguish published roadmaps from uncommitted drafts Issue opened 13 Aug 2026, closed 13 Aug 2026, 4 hours later. 2 replies.Resolve installed loaders from the host project root Patch opened 13 Aug 2026, merged 13 Aug 2026, under an hour later.Keep unpublished roadmap drafts on one version Patch opened 13 Aug 2026, still open.Make roadmap amendments leave only current truth in the artifact Issue opened 25 Aug 2026, closed 25 Aug 2026, 12 hours later. 2 replies.Make both config loaders normalize max_findings to a valid JSON number Issue opened 25 Aug 2026, closed 25 Aug 2026, 10 hours later. 1 reply.Make an explicitly empty PRD glob list disable PRD harvesting Issue opened 25 Aug 2026, closed 25 Aug 2026, 10 hours later. 1 reply.Make the YAML scalar reader honor inline comments Issue opened 25 Aug 2026, closed 25 Aug 2026, 10 hours later. 1 reply.Make CSV glob overrides trim each entry consistently Issue opened 25 Aug 2026, closed 25 Aug 2026, 10 hours later. 1 reply.Normalize loader configuration inputs across platforms Patch opened 25 Aug 2026, still open.fix: leave only current truth in roadmap amendments Patch opened 25 Aug 2026, still open.Make the project constitution agree with current-truth roadmap amendments Issue opened 25 Aug 2026, closed 25 Aug 2026, 1 hour later. 2 replies.docs: define current-truth roadmap amendments Patch opened 25 Aug 2026, still open.release: speckit-roadmap 0.2.0 Patch opened 25 Aug 2026, still open.Keep installed extension documentation resolvable after release filtering Issue opened 25 Aug 2026, closed 28 Aug 2026, 3 days later. 1 reply.
18

Opened 44 patches (20 merged) and 81 issues in 11 repositories since 12 Jul 2026. Merged patches took a median of under an hour to land.

?
Merged patch
A line from the day it opened to the day it merged.
Closed issue
A line from the day it opened to the day it closed, where that day is known.
Row totals
Each row's number is its total for the dates in view.

Commits missing here? Sign them with your Radicle key so they show as yours

Repositories

RepositorySeeds7d
weforge170
tesserine-example-hello160
pentaxis93-nix-config150
gazette-works130
tesserine-agentd130
gazette-craft110
methodology110
tesserine-base110
oracy100
pentaxis93-commons-v2-attic100
aiandi90
methodology-groundwork90
pentaxis93-dotfiles90
pentaxis93-fixture90
tesserine-gazette9+4
weforge-commons90
pentaxis93-fixture80
tesserine-commons80
weforge-commons80
weforge-speckit-weforge-attic80
pentaxis93-dotfiles-attic70
pentaxis93-pentaxis93.dev70
tesserine-runa70
pentaxis93-commons60
tesserine60
pentaxis93-fixture-attic50
pentaxis93-principles50
weforge50

All 28 are listed above. Chart the top 6 together

About this identity

Identity
did:key:z6MkjhPJfa5NTXyCzafzYns8BgQVois3BDxjPm8oJhbduf5F
Alias
mani
First seen by radicle.at
7 July 2026 or earlier
?
Alias
A name its owner chose. It is not unique and nothing verifies it, so the identity above is the part that identifies it.
First seen by radicle.at
radicle.at's record begins on 7 July 2026 and already listed one of these repositories, so the real day may be earlier. The activity above can go back further.